DENR-EMB Wood Processing Certificate of Non-Coverage (CNC)

A Certificate of Non-Coverage (CNC) is an official document issued by the Department of Environment and Natural Resources – Environmental Management Bureau (DENR-EMB), confirming that a proposed project is not covered by the Environmental Impact Statement (EIS) System and therefore does not require an Environmental Compliance Certificate (ECC), subject to the applicable project classification and assessment.

Important terminology: CNC means Certificate of Non-Coverage, not Certificate of Non-Compliance.

For Crown Agarwood Processing Corp. (CAPC), a CNC assessment may be relevant to a facility engaged in agarwood wood preparation, cutting, sorting, grading, chipping, and related processing activities.

1. Applicability to wood processing facilities

A wood processing facility is not automatically entitled to a CNC simply because it handles agricultural or plantation-grown timber. DENR-EMB must determine its environmental coverage based on the actual project activities, location, capacity, and potential environmental impacts.

For an agarwood processing facility, the following activities should be identified separately:

Processing activityCNC assessment considerations
Wood cutting and sizingDust, noise and solid waste
Agarwood chippingDust and equipment emissions
Wood sorting and gradingGenerally lower-impact activity
Wood dryingHeat, fuel use and emissions
Wood grindingDust and noise
PackagingSolid waste
Storage of raw materialsFire safety and material handling
Biomass waste managementWaste disposal and recovery

Important: If the facility includes steam distillation, hydro-distillation, solvent extraction, or supercritical CO₂ extraction, these should be separately disclosed in the project description. They should not be assumed covered by a CNC for wood processing.

2. Documentary requirements

For a Category D CNC application, the following are identified in EMB regional Citizens’ Charters:

Application checklist

  1. Project Description for CNC application.
  2. Valid government-issued identification of the proponent.
  3. Notarized Accountability Statement.
  4. Recent photographs of the project site, taken within 15 days of filing.
  5. Site Development Plan signed by a qualified professional.
  6. PAMB clearance, if the project is within a protected area under NIPAS, where applicable.

Requirements and any additional documents should be confirmed with the responsible EMB Regional Office. r12.emb.gov.ph+2

3. Application procedure

  1. Project coverage screeningAccess the DENR-EMB CNC Online Application System and determine the project’s environmental coverage.
  2. Prepare application documentsComplete the project description, site development plan, photographs and other requirements.
  3. Submit online applicationRegister and submit through the official EMB portal.
  4. EMB evaluationEMB evaluates the project classification and supporting documents. Additional information may be requested.
  5. Payment and issuancePay the applicable assessment fee and complete the issuance process.

Official application portal: DENR-EMB CNC Online Application.

The online portal advises that an approved CNC may be downloaded within five working days after proof of payment is attached, subject to application processing. cnconline.emb.gov.ph

4. Applicable EMB office

For a wood processing facility located in Cavite, such as Silang, the appropriate regional office is:

DENR-EMB CALABARZON (Region IV-A) DENR-EMB CALABARZON Official Website

The EMB CALABARZON Citizens’ Charter identifies CNC processing under its Clearance and Permitting Division. EMB CALABARZON+1

5. Other environmental permits to consider

A CNC does not automatically exempt the facility from other environmental requirements.

Depending on the actual operations, CAPC may also need to assess:

  • Air Pollution Source Installation Permit to Operate (if applicable).
  • Wastewater Discharge Permit (if applicable).
  • Hazardous Waste Generator registration (if applicable).
  • Pollution Control Officer requirements (if applicable).
  • Solid waste management compliance.
  • Local zoning, building, fire safety and business permits.

6. Recommended application structure for CAPC

CROWN AGARWOOD PROCESSING CORP.

PROPOSED ENVIRONMENTAL PROJECT DESCRIPTION

Proposed Project Title: Establishment and Operation of an Agricultural Plantation-Grown Wood Processing Facility

Proposed activities:

  • Agarwood timber preparation
  • Cutting and sizing
  • Chipping and grading
  • Drying and conditioning
  • Grinding and packaging
  • Raw material storage and inventory

Environmental management provisions:

  • Dust collection and ventilation
  • Noise control
  • Proper solid waste segregation
  • Wastewater management, if generated
  • Fire prevention and safety
  • Responsible biomass waste utilizationCNC eligibility subject to EMB evaluation