{"id":482,"date":"2026-11-14T18:23:39","date_gmt":"2026-11-14T10:23:39","guid":{"rendered":"https:\/\/crownfullspectrum.com\/?page_id=482"},"modified":"2026-11-15T04:41:37","modified_gmt":"2026-11-14T20:41:37","slug":"distillation-extraction-facilities","status":"publish","type":"page","link":"https:\/\/crownfullspectrum.com\/?page_id=482","title":{"rendered":"DENR-EMB Distillation and Extraction Guidelines"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Environmental permitting requirements for agarwood distillation, essential oil extraction, and botanical processing facilities<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The establishment of an agarwood distillation and extraction facility requires an assessment by the Department of Environment and Natural Resources \u2013 Environmental Management Bureau (DENR-EMB).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The applicable environmental requirements depend on the facility&#8217;s location, production capacity, processing technology, fuel consumption, wastewater generation, air emissions, and waste classification.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>1. Applicable environmental laws and regulations<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Law \/ Regulation<\/th><th>Application<\/th><\/tr><tr><td>PD 1586<\/td><td>Philippine Environmental Impact Statement System<\/td><\/tr><tr><td>DAO 2003-30<\/td><td>Implementing Rules and Regulations of the Philippine EIS System<\/td><\/tr><tr><td>RA 8749<\/td><td>Philippine Clean Air Act<\/td><\/tr><tr><td>RA 9275<\/td><td>Philippine Clean Water Act<\/td><\/tr><tr><td>RA 9003<\/td><td>Ecological Solid Waste Management Act<\/td><\/tr><tr><td>RA 6969<\/td><td>Toxic Substances and Hazardous and Nuclear Wastes Control Act<\/td><\/tr><tr><td>DAO 2013-22, as amended<\/td><td>Hazardous waste management<\/td><\/tr><tr><td>RA 11038<\/td><td>Expanded National Integrated Protected Areas System, where applicable<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Primary regulatory consideration:<\/strong>&nbsp;The facility must first undergo EMB environmental screening to establish whether an Environmental Compliance Certificate (ECC) or Certificate of Non-Coverage (CNC) is applicable.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>2. Environmental Compliance Certificate (ECC) or Certificate of Non-Coverage (CNC)<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">First step: EMB environmental screening<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The facility must be evaluated under the Philippine Environmental Impact Statement System (PEISS).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Under DAO 2003-30 and the applicable screening guidelines, the classification considers:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Nature and scale of the operation.<\/li>\n\n\n\n<li>Production capacity.<\/li>\n\n\n\n<li>Project location.<\/li>\n\n\n\n<li>Proximity to environmentally critical areas.<\/li>\n\n\n\n<li>Potential air and water pollution.<\/li>\n\n\n\n<li>Waste generation.<\/li>\n\n\n\n<li>Environmental risks and cumulative impacts.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The general project categories are:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Category<\/th><th>Classification<\/th><th>Environmental document<\/th><\/tr><tr><td>A<\/td><td>Environmentally Critical Project (ECP)<\/td><td>ECC<\/td><\/tr><tr><td>B<\/td><td>Non-ECP located in an Environmentally Critical Area (ECA)<\/td><td>ECC<\/td><\/tr><tr><td>C<\/td><td>Environmental enhancement or mitigation project<\/td><td>EMB determination<\/td><\/tr><tr><td>D<\/td><td>Non-ECP in a Non-ECA<\/td><td>CNC, where applicable<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A CNC should not be assumed solely because a facility is small or uses agricultural raw materials. EMB must determine the project&#8217;s coverage.&nbsp;DAO 30.doc+2<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Suggested ECC\/CNC application documents<\/strong><\/h4>\n\n\n\n<ol class=\"wp-block-list\">\n<li>SEC Certificate of Incorporation.<\/li>\n\n\n\n<li>Articles of Incorporation and business registration.<\/li>\n\n\n\n<li>Project Description Report.<\/li>\n\n\n\n<li>Project location and vicinity map.<\/li>\n\n\n\n<li>Site development and facility layout.<\/li>\n\n\n\n<li>Process flow diagram.<\/li>\n\n\n\n<li>Equipment and machinery specifications.<\/li>\n\n\n\n<li>Raw material inventory and estimated production capacity.<\/li>\n\n\n\n<li>Water consumption and wastewater generation estimates.<\/li>\n\n\n\n<li>Air emission sources and pollution control measures.<\/li>\n\n\n\n<li>Solid and hazardous waste management plan.<\/li>\n\n\n\n<li>Land ownership, lease, or authorization documents.<\/li>\n\n\n\n<li>Other documents required by the applicable EMB screening category.<\/li>\n<\/ol>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>3. Air Pollution Control \u2013 Permit to Operate (PTO)<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">RA 8749 \u2013 Clean Air Act<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Distillation and extraction facilities should assess all combustion and air pollution source installations.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Potential sources of air pollution<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Equipment<\/th><th>Environmental concern<\/th><\/tr><tr><td>Biomass-fired boiler<\/td><td>Particulate matter and combustion gases<\/td><\/tr><tr><td>Diesel-fired boiler<\/td><td>Combustion emissions<\/td><\/tr><tr><td>Diesel generator<\/td><td>Exhaust emissions<\/td><\/tr><tr><td>Furnace<\/td><td>Combustion pollutants<\/td><\/tr><tr><td>Wood dryer<\/td><td>Heat and possible particulate emissions<\/td><\/tr><tr><td>Solvent extraction system<\/td><td>Potential VOC emissions<\/td><\/tr><tr><td>CO\u2082 extraction system<\/td><td>CO\u2082 release and occupational safety considerations<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Not every machine automatically requires a PTO. EMB Memorandum Circular 2020-17 provides guidelines for determining which air pollution source installations require a PTO and which are exempt.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>PTO application checklist<\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Equipment inventory and technical specifications.<\/li>\n\n\n\n<li>Boiler capacity and fuel consumption.<\/li>\n\n\n\n<li>Stack and exhaust specifications.<\/li>\n\n\n\n<li>Air pollution control equipment design.<\/li>\n\n\n\n<li>Process flow diagram.<\/li>\n\n\n\n<li>Engineering report.<\/li>\n\n\n\n<li>Location and equipment layout.<\/li>\n\n\n\n<li>ECC or CNC, as applicable.<\/li>\n\n\n\n<li>Other documents required by EMB.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Applications are processed through the EMB Online Permitting and Monitoring System (OPMS).&nbsp;Air Quality Management Section+1<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>4. Wastewater Management \u2013 Discharge Permit<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">RA 9275 \u2013 Clean Water Act<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Distillation and extraction activities may produce wastewater requiring treatment and regulatory assessment.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Potential wastewater sources<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Process<\/th><th>Wastewater<\/th><\/tr><tr><td>Raw material washing<\/td><td>Organic matter and suspended solids<\/td><\/tr><tr><td>Hydro-distillation<\/td><td>Spent distillation water<\/td><\/tr><tr><td>Steam distillation<\/td><td>Condensate and cleaning wastewater<\/td><\/tr><tr><td>Equipment cleaning<\/td><td>Oil, organic residues and detergents<\/td><\/tr><tr><td>Boiler operation<\/td><td>Boiler blowdown<\/td><\/tr><tr><td>Floor washing<\/td><td>Suspended solids and contaminants<\/td><\/tr><tr><td>Sanitary facilities<\/td><td>Domestic wastewater<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Recommended wastewater treatment system<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CAPC wastewater treatment process<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>1. Wastewater collection<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separate process and sanitary wastewater where appropriate<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>2. Screening and equalization<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Remove solids and regulate wastewater flow<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>3. Primary treatment<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Settling and separation of oils, where applicable<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>4. Biological or other appropriate treatment<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Treatment selected based on wastewater characteristics<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>5. Final filtration and testing<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Verify compliance with applicable effluent standards<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>6. Authorized discharge or reuse<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Subject to applicable permit and discharge conditions<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Discharge Permit requirements<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The EMB CALABARZON 2026 Citizen&#8217;s Charter specifies an engineering report and PCO documentation among the requirements. The application also needs information about wastewater sources, flow, treatment, and discharge arrangements.&nbsp;EMB CALABARZON+1<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Important:<\/strong>&nbsp;If wastewater is collected and hauled off-site or completely reused without discharge, the permit applicability must be confirmed with EMB. Do not assume that a discharge permit is automatically required or automatically unnecessary.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>5. Hazardous Waste Management \u2013 RA 6969<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Applicable when regulated hazardous waste is generated<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A distillation and extraction facility must identify, classify, store, and properly dispose of regulated hazardous waste.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Potential waste<\/th><th>Regulatory consideration<\/th><\/tr><tr><td>Used lubricating oil<\/td><td>Used oil classification<\/td><\/tr><tr><td>Spent organic solvents<\/td><td>Solvent waste classification<\/td><\/tr><tr><td>Chemical residues<\/td><td>Based on chemical composition<\/td><\/tr><tr><td>Contaminated containers<\/td><td>Based on previous contents and contamination<\/td><\/tr><tr><td>Laboratory chemical waste<\/td><td>Applicable hazardous waste classification<\/td><\/tr><tr><td>Contaminated filters and absorbents<\/td><td>Based on contamination<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Required compliance activities<\/strong><\/h4>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Register as a hazardous waste generator when applicable.<\/li>\n\n\n\n<li>Obtain a Hazardous Waste Generator ID.<\/li>\n\n\n\n<li>Classify and identify waste codes.<\/li>\n\n\n\n<li>Establish a designated hazardous waste storage area.<\/li>\n\n\n\n<li>Maintain waste inventory and records.<\/li>\n\n\n\n<li>Use authorized hazardous waste transporters.<\/li>\n\n\n\n<li>Send waste to authorized Treatment, Storage and Disposal (TSD) facilities.<\/li>\n\n\n\n<li>Maintain waste manifests and disposal documentation.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The EMB CALABARZON has a specific hazardous waste generator registration procedure under its 2026 Citizen&#8217;s Charter.&nbsp;EMB CALABARZON+1<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>6. Pollution Control Officer (PCO)<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">A Pollution Control Officer is responsible for coordinating environmental compliance and monitoring.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Typical responsibilities include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Monitoring compliance with ECC conditions.<\/li>\n\n\n\n<li>Coordinating PTO and Discharge Permit compliance.<\/li>\n\n\n\n<li>Managing hazardous waste records.<\/li>\n\n\n\n<li>Preparing Self-Monitoring Reports (SMR).<\/li>\n\n\n\n<li>Preparing Compliance Monitoring Reports (CMR).<\/li>\n\n\n\n<li>Coordinating environmental inspections.<\/li>\n\n\n\n<li>Maintaining environmental monitoring records.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">PCO accreditation and appointment requirements must be confirmed with EMB based on the facility&#8217;s classification and applicable regulations.&nbsp;EMB CALABARZON+1<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>7. Environmental requirements by extraction technology<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The following matrix is a practical screening guide, not a determination of mandatory permits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A. Steam distillation<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Boiler and fuel source assessment.<\/li>\n\n\n\n<li>Stack emissions assessment.<\/li>\n\n\n\n<li>Condensate and wastewater management.<\/li>\n\n\n\n<li>Spent biomass management.<\/li>\n\n\n\n<li>PTO screening and wastewater permit assessment.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>B. Hydro-distillation<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Water consumption monitoring.<\/li>\n\n\n\n<li>Spent water characterization.<\/li>\n\n\n\n<li>Organic residue management.<\/li>\n\n\n\n<li>Wastewater treatment assessment.<\/li>\n\n\n\n<li>Boiler or heating source assessment.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>C. Solvent extraction<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Solvent inventory and safety controls.<\/li>\n\n\n\n<li>VOC emissions assessment.<\/li>\n\n\n\n<li>Solvent recovery system.<\/li>\n\n\n\n<li>Hazardous waste classification.<\/li>\n\n\n\n<li>Fire and explosion prevention.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>D. Supercritical CO\u2082 extraction<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>High-pressure equipment safety.<\/li>\n\n\n\n<li>CO\u2082 storage and ventilation.<\/li>\n\n\n\n<li>Pressure relief systems.<\/li>\n\n\n\n<li>Energy consumption.<\/li>\n\n\n\n<li>Waste and spent biomass management.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>8. Recommended DENR-EMB application sequence for CAPC<\/strong><\/h4>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Project planning and site assessment<\/strong>Prepare site development plan, zoning documents, project description, and equipment list.<\/li>\n\n\n\n<li><strong>ECC\/CNC environmental screening<\/strong>Submit project details to EMB and obtain the appropriate environmental determination.<\/li>\n\n\n\n<li><strong>Air pollution assessment<\/strong>Determine whether boilers, generators, furnaces, and other equipment require PTO.<\/li>\n\n\n\n<li><strong>Wastewater assessment<\/strong>Determine discharge permit applicability and wastewater treatment requirements.<\/li>\n\n\n\n<li><strong>Hazardous waste registration<\/strong>Register as a generator if regulated hazardous waste is produced.<\/li>\n\n\n\n<li><strong>PCO accreditation<\/strong>Appoint and accredit the appropriate Pollution Control Officer.<\/li>\n\n\n\n<li><strong>Environmental compliance implementation<\/strong>Implement monitoring, waste management, reporting, and ECC conditions before and during operations.<\/li>\n<\/ol>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>9. Official DENR-EMB resources<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">For a facility in Cavite or elsewhere in CALABARZON:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Office \/ Service<\/th><th>Official resource<\/th><\/tr><tr><td>ECC\/CNC<\/td><td><a href=\"https:\/\/calabarzon.emb.gov.ph\/?utm_source=chatgpt.com\">EMB CALABARZON<\/a><\/td><\/tr><tr><td>PTO<\/td><td><a href=\"https:\/\/calabarzon.emb.gov.ph\/secsime-no-r4a-cpd-11\/?utm_source=chatgpt.com\">PTO application guidelines<\/a><\/td><\/tr><tr><td>Discharge Permit<\/td><td><a href=\"https:\/\/calabarzon.emb.gov.ph\/secsime-no-r4a-cpd-12\/?utm_source=chatgpt.com\">Discharge Permit guidelines<\/a><\/td><\/tr><tr><td>Hazardous Waste ID<\/td><td><a href=\"https:\/\/calabarzon.emb.gov.ph\/secsime-no-r4a-cpd-08\/?utm_source=chatgpt.com\">Hazardous Waste Generator registration<\/a><\/td><\/tr><tr><td>Citizen&#8217;s Charter<\/td><td><a href=\"https:\/\/calabarzon.emb.gov.ph\/about-us\/citizens-charter\/?utm_source=chatgpt.com\">2026 EMB Citizen&#8217;s Charter<\/a><\/td><\/tr><tr><td>Online permitting<\/td><td><a href=\"https:\/\/opms.emb.gov.ph\/?utm_source=chatgpt.com\">EMB OPMS<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>10. Recommended CAPC Environmental Compliance Checklist<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">This is the proposed document package for Crown Agarwood Processing Corp.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CAPC compliance preparation<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">0\/12 completedProject Description ReportSite Development Plan and Vicinity MapProcess Flow DiagramEquipment and Machinery InventoryECC\/CNC Environmental ScreeningAir Pollution Source InventoryPTO Applicability AssessmentWastewater Characterization and Treatment PlanDischarge Permit Applicability AssessmentHazardous Waste Management PlanPCO Appointment and AccreditationEnvironmental Monitoring and Reporting Plan<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>11. Information needed to determine the exact CAPC permits<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">The most important distinction is whether the facility is purely a botanical extraction plant or also operates a conventional wood processing line.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a more accurate DENR regulatory assessment, I recommend starting with these operating specifications:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CAPC facility assessment<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Extraction technologySteam and hydro-distillationSupercritical CO\u2082 extractionSolvent extractionIntegrated extraction technologies<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Estimated processing capacityBelow 100 kg per batch100\u2013500 kg per batch500\u20131,000 kg per batchAbove 1,000 kg per batch<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Heating or energy sourceLPGDieselBiomassElectricityCombination<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Will the facility also process wood?YesNo \u2013 extraction onlyPrepare CAPC DENR-EMB permit assessment<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The objective is to establish a compliant, integrated agarwood extraction facility without overlooking environmental permits or applying for unnecessary clearances.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Environmental permitting requirements for agarwood distillation, essential oil extraction, and botanical processing facilities The establishment of an agarwood distillation and extraction facility requires an assessment by the Department of Environment and Natural Resources \u2013 Environmental Management Bureau (DENR-EMB). The applicable environmental requirements depend on the facility&#8217;s location, production capacity, processing technology, fuel consumption, wastewater generation, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":459,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-482","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/crownfullspectrum.com\/index.php?rest_route=\/wp\/v2\/pages\/482","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/crownfullspectrum.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/crownfullspectrum.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/crownfullspectrum.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/crownfullspectrum.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=482"}],"version-history":[{"count":4,"href":"https:\/\/crownfullspectrum.com\/index.php?rest_route=\/wp\/v2\/pages\/482\/revisions"}],"predecessor-version":[{"id":529,"href":"https:\/\/crownfullspectrum.com\/index.php?rest_route=\/wp\/v2\/pages\/482\/revisions\/529"}],"up":[{"embeddable":true,"href":"https:\/\/crownfullspectrum.com\/index.php?rest_route=\/wp\/v2\/pages\/459"}],"wp:attachment":[{"href":"https:\/\/crownfullspectrum.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=482"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}